Scaffolding invoice template: erect, dismantle, hire and CIS
A scaffolding invoice mixes labour and hire, and HMRC treats the two differently. Whether you own the scaffold or hired it in changes the CIS deduction, and the way you word the lines can change the VAT. This guide walks through both with checked examples.
Make your invoice in a minute
Try it freeMake an invoice now, no sign-up. Then 14 days free, then £1.99 a month or £19.99 a year.Trade invoice templates: other tradesOn this page
- Scaffolding rates: why a day rate is only part of it
- What goes on a scaffolding invoice
- CIS: erecting, hiring and the scaffold you own
- Worked example: a refurbishment job for a builder
- VAT traps that are specific to scaffolding
- Scaffolding for homeowners
- Common mistakes
- Free scaffolding invoice template
- Related trade guides
Scaffolding rates: why a day rate is only part of it
Checkatrade's trade cost table (updated October 2026) lists scaffolders at £250 to £350 a day, or about £40 an hour. That's the labour figure homeowners see. Most scaffolding isn't sold by the day at all: it's priced per job (erect, a set hire period, dismantle), then weekly hire after that. If you employ labourers, the CIJC Working Rule Agreement, which NASC members use, sets minimum hourly pay from 20 July 2026, starting at £13.18 an hour for a general operative. Those are employee minimums, not subcontract rates.
To price a job, add up the gang's labour days, the yard and transport time, and what the kit costs you per week, then add your margin. The day rate calculator and the markup and margin calculator help with the sums.
If you also do general labouring between scaffold jobs, see the labourer invoice template.
What goes on a scaffolding invoice
- The quote or order reference and the elevation or area (for example "rear elevation, 3 lifts, 12 m run").
- Erect and dismantle, as quoted. Many scaffolders invoice the erect on completion and the dismantle when it comes down.
- Hire: the period included in the quote, then extra weeks with the dates ("hire week 5: 1 to 7 Dec").
- Adaptations: extra lifts, loading bays, moving boards for another trade. Say who asked and when.
- Hired-in kit, if you hired tube, fittings, a hoist or a tower from someone else for this job. Keep the hire invoice.
- Inspection reports are separate documents, but a reference helps match the invoice to the scaffold.
CIS: erecting, hiring and the scaffold you own
Erecting and dismantling scaffolding is a construction operation (CIS 340 and HMRC's manual CISR14240). Hiring scaffolding without labour is outside CIS. But a single contract to hire, erect and dismantle is a mixed contract, and HMRC says all payments under a contract that includes construction operations come within the scheme. So on most scaffolding jobs for a builder, CIS applies to the whole invoice.
The detail that changes your pay is who owns the kit. HMRC's plant hire guidance (CISR14260) says plant, which includes scaffolding, can be treated as materials when working out the deduction only if you hired it from a third party. If you own the scaffold, no notional deduction for it is allowed, so the contractor deducts CIS from the whole charge apart from VAT and any genuine materials or consumables. Buying kit on hire purchase doesn't count as hiring it.
Worked example: a refurbishment job for a builder
Lee's firm scaffolds the rear of a house a builder is refurbishing. Lee is CIS registered (20%) and VAT registered. The figures are illustrations, not typical prices.
| Line | Qty | Rate | Amount |
|---|---|---|---|
| Erect and dismantle, rear elevation, as quote Q-118 | 1 | £1,650.00 | £1,650.00 |
| Hire, weeks 1 to 4 (28 Sep to 25 Oct) | 4 weeks | £90.00 | £360.00 |
| Adaptation: extra lift for roofer, requested by site manager 14 Oct | 1 | £175.00 | £175.00 |
| Net total | £2,185.00 |
| CIS | Lee owns all the kit | Lee hired in £300 of fittings for this job |
|---|---|---|
| Net total | £2,185.00 | £2,185.00 |
| Treated as materials | £0.00 | £300.00 |
| Subject to CIS | £2,185.00 | £1,885.00 |
| CIS deduction at 20% | £437.00 | £377.00 |
| Paid to Lee | £1,748.00 | £1,808.00 |
In the second column, £300 of the charges is for fittings Lee hired in from a supplier for this job. He shows that cost on its own line and attaches the hire invoice, so the contractor can treat it as materials. Check: 20% of £2,185 is £437.00 and 20% of £1,885 is £377.00.
VAT: this is standard-rated refurbishment work for a VAT and CIS-registered builder, so the reverse charge applies. The invoice says "Reverse charge: Customer to pay the VAT to HMRC" and shows the VAT the builder accounts for, 20% of £2,185.00 = £437.00, but it isn't added to the amount due. With no materials, the CIS deduction and the reverse charge VAT come to the same figure. They're different things: one is tax taken from your pay, the other is VAT you don't collect.
VAT traps that are specific to scaffolding
- Hire only (no erect or dismantle) isn't a construction service. The reverse charge doesn't apply, so charge VAT in the normal way if you're registered.
- Standard or reduced-rated projects: HMRC's reverse charge technical guide says a contract to hire, erect and dismantle is standard rated and goes under the reverse charge if the other conditions are met. If your invoice shows one charge for hire and labour, the whole value is reverse charged.
- New build housing: erecting and dismantling for zero-rated construction can be zero rated, but the hire charge isn't covered by the zero rate. Show hire and labour separately so the labour can be zero rated and VAT is charged on the hire.
- Homeowners and end users are charged VAT in the normal way.
Scaffolding for homeowners
A homeowner isn't a CIS contractor, so there's no deduction and no reverse charge. Quote a fixed price that includes a set hire period, state the weekly rate after that, and put both on the invoice. Domestic customers are the ones most surprised by extra hire weeks, so send a short reminder before the included period runs out.
Common mistakes
- Expecting the contractor to treat your own scaffold as "plant hire" for CIS. Only kit hired from a third party can be treated as materials.
- Invoicing extra hire weeks months later with no dates. Invoice weekly or monthly with the period on each line.
- Adaptations with no name or date. Write down who asked for the change.
- Reverse charging a hire-only invoice. Hire on its own is outside the reverse charge.
- One combined line on new build housing work, which can lose you the zero rate on the labour.
Free scaffolding invoice template
This free scaffolder invoice template is made for the trade: erect and dismantle, weekly hire and adaptations, plus fittings hired in. Page 1 is a blank invoice with prompt lines for scaffolder work, separate labour and materials sections, and the VAT and CIS sums. Page 2 is the worked example from this page filled in, showing what you're paid at 20%, 30% and 0% CIS. The Excel version adds everything up for you.
CIS in one line: the contractor takes 20% (registered), 30% (not registered) or 0% (gross payment status) from the labour only, not from VAT or the materials, consumables and plant hire you paid for. In the template example that's £437.00 at 20%, £655.50 at 30% and nothing at 0%.
Prefer a plain layout? There's the general CIS invoice template (PDF or Excel). For homeowners, the general invoice template (PDF, Word or Excel) works. To see the reverse charge and CIS wording on a finished invoice, open the sample invoice. If CIS is taken off your pay, the CIS refund checker gives a quick estimate (not tax advice) of whether you may be due money back.
Related trade guides
Scaffold is usually there for the roofer, bricklayer or painter and decorator. If you also run plant, the groundworker guide covers plant and fuel. See all trade invoicing guides. Steel erection and site welding are covered in the welder and fabricator guide.
Supplying a machine with an operator? The plant operator invoice template shows operated hire, fuel and the CIS sums.
Free: The UK Contractor's Cheat Sheet 2026/27
CIS rates, overtime maths, tax dates, mileage, VAT and late payment, on 2 pages. Keep it on your phone or print it for the van.
Frequently asked questions
Is scaffolding hire subject to CIS?
Hire without labour is outside CIS. A contract to hire, erect and dismantle is within CIS, and the whole payment is caught.
Can my own scaffold be treated as materials for CIS?
No. Only plant hired from a third party for the job can be treated as materials. Your own kit, including kit bought on hire purchase, can't.
Does the reverse charge apply to scaffolding?
Yes, for hire, erect and dismantle contracts on standard or reduced-rated work for a VAT and CIS-registered customer who isn't an end user. Not for hire only.
How should I invoice extra hire weeks?
As separate lines with the dates covered, billed at the weekly rate in your quote, ideally every week or month while the scaffold is up.
Sources
- Construction Industry Scheme manual CISR14260: plant hire – HMRC
- Construction Industry Scheme manual CISR14240: preparatory, integral and finishing operations – HMRC
- CIS 340: guide for contractors and subcontractors – GOV.UK
- VAT reverse charge technical guide (scaffolding section) – GOV.UK
- How much do tradespeople cost in the UK in 2026? (scaffolder rates, updated October 2026) – Checkatrade
- New CIJC pay rates from 20 July 2026 – NASC
This guide is general information, not legal, tax or financial advice. Rules and rates change, so check the linked GOV.UK pages for the current position.