How to convert a day rate to an hourly rate (and back)
Agencies and clients mix day rates and hourly rates all the time. Converting between them is simple arithmetic, but getting the rounding wrong can leave invoice totals a few pence out, which is enough for an accounts team to reject them. Here's the method, with worked examples.
Make your invoice in a minute
Try it freeMake an invoice now, no sign-up. Then 14 days free, then £1.99 a month or £19.99 a year.Trade invoice templates: find yoursOn this page
- The formula
- Quick reference table
- Avoiding rounding errors
- Part days
- See it in the free calculator
- Pricing overtime from a day rate
- Converting an hourly offer into a day rate
- From day rate to a rough annual figure
- A note on minimum wage
- Worked example: a full week from a day rate
- Day rate or hourly: which should you quote?
Short answer: divide your day rate by the standard hours in the day agreed with the client (£180 ÷ 8 = £22.50 an hour). Keep the full-precision figure for your sums, round only each invoice line, and write down the hours your day rate covers. Updated 15 October 2026.
The formula
Hourly rate = day rate ÷ standard hours in a day
Day rate = hourly rate × standard hours in a day
The key is the "standard hours" figure. It must be what you and the client agreed, not what you happen to work. Common standard days are 7.5 hours (typical office hours), 8 hours (common in construction and logistics) and 10 hours (some site work and shifts).
Want to skip the arithmetic? The day rate calculator does the conversion, including overtime and weekend rates, in your browser.
Quick reference table
| Day rate | 7.5-hour day | 8-hour day | 10-hour day |
|---|---|---|---|
| £120 | £16.00 | £15.00 | £12.00 |
| £150 | £20.00 | £18.75 | £15.00 |
| £165 | £22.00 | £20.625 | £16.50 |
| £180 | £24.00 | £22.50 | £18.00 |
| £200 | £26.666… | £25.00 | £20.00 |
| £250 | £33.333… | £31.25 | £25.00 |
| £300 | £40.00 | £37.50 | £30.00 |
Notice the rates that don't divide neatly, like £165 over 8 hours (£20.625) or £200 over 7.5 hours (£26.666…). That's where invoices go wrong.
Avoiding rounding errors
Take a £200 day rate and a 7.5-hour day. The exact hourly rate is £26.6666… If you round it to £26.67 and multiply back by 7.5, you get £200.03. Round down to £26.66 and you get £199.95. Neither matches the agreed £200.
The reliable approach:
- Keep the hourly rate at full precision in your calculations.
- Work out each line as exact rate × hours.
- Round the line amount to the nearest penny.
- Show the unit rate rounded to 2 decimal places, for readability only.
Done this way, 7.5 hours at £26.666… comes to exactly £200.00, 8 hours at £20.625 comes to exactly £165.00, and half days come out at exactly half the day rate.
Part days
If you work less than a full day, the hourly rate makes billing fair and simple:
- 4 hours on a £165 / 8-hour day: 4 × £20.625 = £82.50 (exactly half).
- 6 hours on a £180 / 8-hour day: 6 × £22.50 = £135.00.
- 5.5 hours on a £200 / 7.5-hour day: 5.5 × £26.666… = £146.666…, so £146.67.
Some contracts say part days are paid as half or full days instead of by the hour. If yours does, follow the contract and describe the line accordingly (e.g. "Half day").
See it in the free calculator
This is the day rate calculator with a £165 day rate, an 8-hour day, overtime at ×1.25, Saturdays at ×1.25 and Sundays at ×1.5. Those multipliers are examples, not standards. Use whatever you agreed.

Pricing overtime from a day rate
Once you have the exact hourly rate, overtime is just a multiplier: hourly × 1.25 for time and a quarter, × 1.5 for time and a half, and so on. On a £165 / 8-hour day, overtime at time and a quarter is £25.78125 an hour, so 2 hours is £51.56. See overtime rates on invoices for more.
For a whole week laid out line by line, see the weekly timesheet invoice template.
Converting an hourly offer into a day rate
If an agency offers £22 an hour and you're used to thinking in days, multiply by the standard hours: £22 × 8 = £176 a day, or £22 × 7.5 = £165 a day. Check the standard day length before comparing offers: £176 for an 8-hour day and £165 for a 7.5-hour day are the same hourly rate.
From day rate to a rough annual figure
Use the day rate to annual income calculator to turn a day rate into weekly, monthly and yearly income with your own working days.
A day rate only turns into income for the days you actually work. To compare a contract with a salaried job, estimate your billable days honestly: subtract weekends, bank holidays, the holidays you plan to take, sick days and gaps between contracts. For example, 220 billable days at £165 is £36,300 a year before tax and costs. As a self-employed worker you also pay for your own tools, travel, insurance and pension, and you don't get paid holiday. This is a rough planning sum, not tax advice.
A note on minimum wage
If you're an employee or an agency worker paid through PAYE, your hourly pay must not fall below the National Minimum Wage or National Living Wage for your age. GOV.UK publishes the current rates. Genuinely self-employed people aren't covered by minimum wage law, but if a "day rate" works out very low per hour, it's worth checking your employment status.
Worked example: a full week from a day rate
Jo's day rate is £180 for an 8-hour day, so her hourly rate is £180 ÷ 8 = £22.50. Her client pays overtime at time and a quarter (×1.25) and Saturdays at time and a half (×1.5). That Saturday rate is what Jo agreed with this client. BillMyWeek's defaults are ×1.25 for weekday overtime and Saturdays and ×1.5 for Sundays, and you can change them to match your own agreement. Her week:
| Line | Hours | Rate | Amount |
|---|---|---|---|
| Mon–Fri standard (5 × 8 h) | 40 | £22.50 | £900.00 |
| Weekday overtime | 6 | £28.125 | £168.75 |
| Saturday (time and a half) | 5 | £33.75 | £168.75 |
| Total | 51 | £1,237.50 |
Check: five standard days at £180 is £900, which matches the first line exactly. If the hourly rate had a recurring decimal (say £175 ÷ 7.5 = £23.3333…), keep the full figure in your working and round each line, not the rate.
Day rate or hourly: which should you quote?
| Day rate | Hourly rate | |
|---|---|---|
| Works best for | Site work or agency shifts where a "day" is well defined | Short jobs, call-outs, part days and unpredictable hours |
| Short day | Needs a rule (half day, minimum charge) agreed up front | Pays exactly for the hours worked |
| Overtime | Needs the standard hours stated, then a multiplier | A multiplier applies directly to the hourly rate |
| Easy to compare with a salary | Needs a days-per-year estimate | Needs a hours-per-year estimate |
A day rate suits work where a "day" is well defined and the client mostly cares about attendance, such as site work or agency shifts. An hourly rate suits short or unpredictable jobs, call-outs and part days. Many contractors quote a day rate and state the hours it covers ("£180 per 8-hour day, overtime at time and a quarter"), which gives you both. Whatever you choose, put it in writing before you start, so the invoice simply repeats what was agreed.
For short days, see how to charge half days and part days; for annual reviews, our rate increase letter template.
To see a full week built from a day rate, with overtime, materials and CIS, read the weekly day-rate invoice guide.
Working extra hours? The overtime pay calculator works out time and a half, double time or any agreed rate from an hourly or day rate.
Free: The UK Contractor's Cheat Sheet 2026/27
CIS rates, overtime maths, tax dates, mileage, VAT and late payment, on 2 pages. Keep it on your phone or print it for the van.
Frequently asked questions
How do I convert a day rate to an hourly rate?
Divide the day rate by the agreed number of hours in a standard day. For example, £165 ÷ 8 = £20.625 an hour.
Is a working day 7.5 or 8 hours?
There's no single rule. Office-based roles are often 7.5 hours and site or shift work is often 8 or more. Use whatever your contract says.
Why is my invoice total a few pence out?
You probably rounded the hourly rate before multiplying. Keep the exact rate for calculations and round only the final line amount.
How do I bill half a day?
Either bill the hours at the exact hourly rate (4 hours of an 8-hour £165 day = £82.50) or bill a half day if your contract says so.
Is it better to charge a day rate or an hourly rate?
It depends on the job. A day rate suits well-defined site or agency days. An hourly rate suits short jobs and part days. Many contractors quote a day rate and state the hours it covers, so both are clear.
How do I compare an hourly offer with my day rate?
Multiply the hourly rate by the standard hours per day. £22 × 7.5 = £165, and £22 × 8 = £176.
Sources
This guide is general information, not legal, tax or financial advice. Rules and rates change, so check the linked GOV.UK pages for the current position.