BillMyWeek How it worksGuidesFree toolsLog inSign up

Joiner and carpenter invoice template: first fix, second fix and day work

Trades · Published 16 October 2026 · 4 min read

Joinery work is often priced per item: per door hung, per metre of skirting, per window. Mixed with day work and your own fixings, an invoice can get untidy fast. Here is a clean layout, a worked CIS example, and how to describe first and second fix.

On this page
  1. First fix and second fix, in plain words
  2. Worked example: a second fix invoice
  3. CIS on the joiner's invoice
  4. Per item or by the day?
  5. Homeowner and small domestic jobs
  6. VAT
  7. Joiner invoice checklist
  8. More trade invoice guides

First fix and second fix, in plain words

First fix is the structural carpentry that gets covered up: stud walls, floor joists, roof timbers, door linings and noggins for later fixings. Second fix is the visible finish after plastering: hanging doors, fitting skirting and architrave, stairs parts, shelving and ironmongery. They are often priced and invoiced separately because the work happens weeks apart, with other trades in between.

State which stage each line is. "First fix, plots 3 to 5" and "Second fix, plot 3" tell the contractor exactly what to check and avoid duplicate claims.

The prices on this page are illustrations for the arithmetic, not market rates.

Worked example: a second fix invoice

Aisha is a self-employed joiner on a four-house development. She is paid per door, per metre of skirting and a day rate for odd jobs.

LineQtyRateAmount
Plot 3, second fix: internal doors hung, with ironmongery fitted8 doors£85.00£680.00
Plot 3, skirting boards fitted and caulked62 m£4.50£279.00
Day work: boxing in soil pipe and fitting loft hatch (instruction 22)1 day£200.00£200.00
Hinges, screws and adhesive bought for plot 3 (receipts attached)1£38.40 at cost£38.40
Total£1,197.40

The labour in this invoice is £680.00 + £279.00 + £200.00 = £1,159.00.

CIS on the joiner's invoice

Carpentry and joinery on a building is construction work. For a contractor, GOV.UK says to start from the invoice total, take away VAT and anything you paid for materials, and apply 20%, 30% or 0% to what is left depending on your CIS status.

StepAmount
Invoice total£1,197.40
Less materials you paid for£38.40
Labour subject to CIS£1,159.00
CIS deduction at 20%£231.80
Paid to you (£1,197.40 − £231.80)£965.60

If the contractor supplies all the timber, doors and ironmongery, your invoice is all labour and the deduction applies to the whole total. Keep this distinction clear in writing. See what counts as materials under CIS.

Per item or by the day?

  • Per item suits repeat work where each unit is the same: doors, windows, kitchens or metres of boarding. It rewards speed but needs clear counts.
  • By the day suits repairs, alterations and awkward old houses. Use the day rate calculator to compare a day rate with an hourly rate.

Whichever you choose, agree the unit, the rate and what is included (for example, who supplies door furniture) before the job starts.

Homeowner and small domestic jobs

For a homeowner, CIS does not apply and you would normally quote a fixed price for the job. Keep the invoice matched to the quote: "Supply and fit oak staircase handrail and spindles: £1,350.00". If extra work was agreed, add it as a separate line with the date it was agreed. If there was a deposit, show it as a deduction. See deposits and stage payments.

VAT

If you are not VAT registered, you add no VAT. If you are, work for a VAT-registered contractor that falls under CIS is generally covered by the domestic reverse charge, so the contractor accounts for the VAT. See the reverse charge guide.

Joiner invoice checklist

  • Your name, address, unique invoice number and dates.
  • The contractor or customer, site and plot.
  • Stage on each line: first fix, second fix or day work.
  • Quantity, unit and rate for item prices.
  • Day work with date, instruction and hours or days.
  • Materials you bought, with receipts, on separate lines.
  • CIS summary and amount payable.
  • Bank details and terms.

Download the free CIS invoice template if you want a ready-made layout.

More trade invoice guides

Other trades invoice differently. See the guides for bricklayer, labourer, plumber, painter and decorator, groundworker, electrician and plasterer, or browse all trade invoicing guides. For the rules that apply to every trade, read the invoice requirements for sole traders, and use the day rate calculator to turn a day rate into an hourly rate.

How BillMyWeek helps: BillMyWeek fills in weeks of day-rate work and handles CIS on labour, with lines flagged as materials. For per-item pricing you can edit lines to show quantities and rates. Start your 14-day free trial, then £1.99 a month or £19.99 a year.

Frequently asked questions

What is the difference between first fix and second fix?

First fix is structural carpentry that gets covered up, such as stud walls and joists. Second fix is the visible finish after plastering, such as doors and skirting.

Should joiners charge per door or per day?

Either. Per door suits repeat work, while a day rate suits repairs and awkward jobs. Agree the unit and rate in advance.

Does CIS apply to joinery?

Yes. Carpentry and joinery on a building is construction work, so a contractor will normally deduct CIS from the labour.

How do I show materials on a joiner's invoice?

On separate lines at cost with receipts, so the CIS deduction is not taken from them.

Sources

This guide is general information, not legal, tax or financial advice. Rules and rates change, so check the linked GOV.UK pages for the current position.

Make this week's invoice in a minute

BillMyWeek fills in your days, day rate and overtime, takes CIS off labour if you need it, and gives you a clean PDF to send. 14 days free, then £1.99 a month. No card needed to start.

Start your free trial

Free tools

Start a free BillMyWeek trial to turn your numbers into a ready-to-send invoice.